1、把两半柱础扣在柱子底部,把接缝处焊点焊牢,使之成为一个整体;
1. First, buckle the two half column bases at the bottom of the column, weld the joints firmly, and make them a whole;
2、校正位置使柱子在中心;
2. Correct the position so that the column is in the center;
3、用水泥砂浆把柱础和内柱之间的空隙灌满;
3. Fill the gap between the column base and the inner column with cement mortar;
4、同样的方法依次向上安柱身,一节一浇灌,直到柱头为止。罗马柱安装节点圆桶罗马柱安装有两种:一种是非承重型空体罗马柱安装,另一种是承重型罗马柱安装。
4. In the same way, the column body is installed upward in turn, and the water is poured one by one until the column head. There are two kinds of Roman column installation nodes: one is the non load bearing empty Roman column installation, the other is the load-bearing Roman column installation.
、非承重型空体GRC罗马柱安装节点
First, non load bearing empty GRC Roman column installation node
1、要在柱子安装位置,砖彻体或混凝土中上下预埋焊点。
1. First of all, the welding points shall be embedded up and down in the column installation position, brick body or concrete.
2、按GRC构件罗马柱的内径用角钢焊成三角架做内龙骨,下面先与地下埋件焊接牢固,上面先留有余地,三角架可随安装随往上接。
2. According to the inner diameter of the GRC component Roman column, angle steel is welded into a tripod to make the inner keel. The lower part is welded firmly with the underground embedded parts first, and there is room on the upper part. The tripod can be connected up with the installation.
3、把柱础、柱身套在龙骨上,校正好凹槽位置,然后把柱础柱身上面埋有的焊点用钢筋连结在龙骨上,依次一节一节的对槽垂直安装,直到后一节柱身为止。
3. Put the column base and the column body on the keel, correct the groove position, and then connect the welding points embedded on the column body with steel bars on the keel, and install them vertically one by one until the last column body.
4、柱头是由两半构成,把三角龙骨一直接到上面埋件焊死,然后先把头和半柱头组合好,把接缝处的所有焊点焊死。
4. The column head is composed of two parts. Weld the embedded parts directly to the top of the triangular keel, and then assemble the head and the first half of the column head to weld all the welding joints at the joint.
5、后用水泥把所有接缝处理平整,圆滑即可。
5. Finally, use cement to smooth all joints.
第二、承重型GRC罗马柱安装方法
Second, installation method of load-bearing GRC Roman column
同于非承重型GRC构件罗马柱安装方法,只是在安装完毕后,从上口灌入混凝土即可,不同的是承重型GRC罗马柱要先安柱而后盖顶,否则混凝土则无法灌入而非承重型GRC罗马柱则可先有建筑物而后安GRC罗马柱装饰。
As for the installation method of non load bearing GRC component Roman column, only after the installation is completed, the concrete can be poured from the upper opening. The difference is that the load-bearing GRC Roman column should be installed first and then covered, otherwise the concrete can not be poured into the non load-bearing GRC Roman column, and then the building can be installed first and then the GRC Roman column decoration.
The above is the whole content of the production and installation of GRC component Roman column. Jinan GRC component is dedicated. If you have other questions, please consult Jinan GRC component website http://www.aswjc.com !